{"id":55625,"date":"2026-06-10T10:00:06","date_gmt":"2026-06-10T08:00:06","guid":{"rendered":"https:\/\/arvengtraining.com\/?p=55625"},"modified":"2026-06-10T10:09:22","modified_gmt":"2026-06-10T08:09:22","slug":"structuring-engineering-presentation-budget-approval","status":"publish","type":"post","link":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/","title":{"rendered":"How to Structure an Engineering Presentation for Budget Approval"},"content":{"rendered":"<p>In the industrial sector, achieving engineering budget approval or a change in technical criteria is usually a challenge. A common mistake when requesting these funds is burying management under a mountain of data or material take-offs. Although technical accuracy is indispensable, the reality is that to secure engineering budget approval, the order of the argument matters far more than data density.<\/p>\n<p>When you present to a financial committee or plant management to justify an investment (such as advanced design software or a routing modification in a pressure piping system), the board of directors does not evaluate the complexity of the design. It evaluates risk, return on investment (ROI), and operational impact.<\/p>\n<p>Below, we analyze how to structure a technical presentation to secure budget approvals in an agile and solid manner.<\/p>\n<h2><strong>The Argumentative Structure: The Order of Factors Does Change the Product<\/strong><\/h2>\n<p>To change a client&#8217;s technical criteria or secure funds for an engineering project, you must abandon the chronological order of the design and adopt an inverted pyramid structure: impact first, technical details later.<\/p>\n<h3><strong>1. The Operational Hook (The Financial Problem)<\/strong><\/h3>\n<p>Never start by explaining the technical solution. Begin by outlining the current situation, the bottleneck, or the mechanical integrity risk that justifies the meeting.<\/p>\n<ul>\n<li><strong>Focus:<\/strong> Plant downtime hours, regulatory penalty risks (such as non-compliance with the PED directive), or exorbitant preventive maintenance costs.<\/li>\n<\/ul>\n<h3><strong>2. The Technical-Economic Value Proposition<\/strong><\/h3>\n<p>Clearly define the change in criteria or the requested investment. Instead of saying &#8220;We need to switch to the Design by Analysis (DBA) methodology under <a href=\"https:\/\/arvengtraining.com\/en\/all-courses\/asme-viii-design-pressure-vessels-online\/\">ASME VIII<\/a> Div. 2&#8243;, say: &#8220;I propose applying an advanced design method that will reduce pressure vessel thickness and weight by 15%, optimizing manufacturing costs.&#8221;<\/p>\n<h3><strong>3. Technical Justification and Impact<\/strong><\/h3>\n<p>This is where you introduce the data, but filtered through a business lens. Structure the argument in three ordered layers:<\/p>\n<ul>\n<li><strong>Safety and Compliance:<\/strong> How the investment mitigates catastrophic failures, due to fatigue or dynamic vibration, for example.<\/li>\n<li><strong>Operational Flexibility:<\/strong> The immediate benefit to project execution schedules.<\/li>\n<li><strong>Supporting Data:<\/strong> Clean charts and key conclusions from your flexibility analyses or standards. Leave full calculation reports as appendices for the Q&amp;A session.<\/li>\n<\/ul>\n<h3><strong>4. Return on Investment (ROI) and Risk Mitigation<\/strong><\/h3>\n<p>Senior engineering understands costs. Present a simple comparative analysis: the cost of implementing the solution versus the cost of doing nothing (inaction). If the cost of inaction exceeds the required investment in the medium term, the budget will be practically approved.<\/p>\n<h2><strong>Data vs. Argument: Why Excessive Technicalities Weaken Your Proposal<\/strong><\/h2>\n<p>The engineer&#8217;s bias is usually an &#8220;overreliance on data.&#8221; Showing stiffness matrices or response spectra to a chief financial officer only generates decision fatigue and mistrust.<\/p>\n<p><strong>Golden rule:<\/strong> Data does not defend itself; it needs a driving narrative. A single strategic data point (e.g., &#8220;This support modification reduces stress at the equipment nozzles by 40% and doubles its lifecycle&#8221;) has an infinitely greater impact than a 50-page calculation report.<\/p>\n<h2><strong>Conclusion<\/strong><\/h2>\n<p>Securing a budget approval or a change in regulatory criteria in an industrial environment requires a mental transition: thinking like an engineer, arguing like an executive. If you structure your presentation by prioritizing the order of the argument over data density, you will transform technical barriers into profitable and safe business decisions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the industrial sector, achieving engineering budget approval or a change in technical criteria is usually a challenge. A common mistake when requesting these funds is burying management under a mountain of data or material take-offs. Although technical accuracy is indispensable, the reality is that to secure engineering budget approval, the order of the argument [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":55673,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1476],"tags":[1600,1859,1860,1861,1862],"class_list":["post-55625","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-desarrollo-profesional","tag-mechanical-engineering","tag-engineering-project-management","tag-technical-leadership","tag-plant-management","tag-industrial-roi"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to present engineering projects<\/title>\n<meta name=\"description\" content=\"Discover how to structure an effective technical presentation for management to achieve budget approvals and changes of engineering criteria.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to present engineering projects\" \/>\n<meta property=\"og:description\" content=\"Discover how to structure an effective technical presentation for management to achieve budget approvals and changes of engineering criteria.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/\" \/>\n<meta property=\"og:site_name\" content=\"Arveng Training &amp; Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ArvengTraining\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/Arveng-Consulting-1397115983869206\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-10T08:00:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-10T08:09:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arvengtraining.com\/wp-content\/uploads\/2026\/06\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"513\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arvengtraining\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ArvengTrainEng\" \/>\n<meta name=\"twitter:site\" content=\"@ArvengTraining\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arvengtraining\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/\"},\"author\":{\"name\":\"arvengtraining\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#\\\/schema\\\/person\\\/84221a22d2933a1a709cf666696d0955\"},\"headline\":\"How to Structure an Engineering Presentation for Budget Approval\",\"datePublished\":\"2026-06-10T08:00:06+00:00\",\"dateModified\":\"2026-06-10T08:09:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/\"},\"wordCount\":540,\"publisher\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg\",\"keywords\":[\"mechanical engineering\",\"Engineering Project Management\",\"Technical Leadership\",\"Plant Management\",\"Industrial ROI\"],\"articleSection\":[\"Professional Development\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/\",\"name\":\"How to present engineering projects\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg\",\"datePublished\":\"2026-06-10T08:00:06+00:00\",\"dateModified\":\"2026-06-10T08:09:22+00:00\",\"description\":\"Discover how to structure an effective technical presentation for management to achieve budget approvals and changes of engineering criteria.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#primaryimage\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg\",\"contentUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg\",\"width\":1200,\"height\":513},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Structure an Engineering Presentation for Budget Approval\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#website\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/\",\"name\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\",\"description\":\"We provide Specialized Training &amp; Engineering Services, answers and solutions for specific requirements.\",\"publisher\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\"},\"alternateName\":\"Arveng Training & Engineering - Formaci\u00f3n en ingenier\u00eda online\\\/presencial\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arvengtraining.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\",\"name\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ArvengTraining\",\"https:\\\/\\\/x.com\\\/ArvengTraining\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/arvengtraining\\\/\",\"http:\\\/\\\/wwwyoutube.com\\\/ArvengTraining\",\"https:\\\/\\\/www.instagram.com\\\/arveng_training\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/arvengtraining\\\/\"],\"address\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"40.488398\",\"longitude\":\"-3.67123715\"},\"telephone\":[\"913 40 88 51\"],\"contactPoint\":{\"@type\":\"ContactPoint\",\"telephone\":\"913408851\",\"email\":\"info@arvenggroup.com\"},\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\"],\"opens\":\"09:00\",\"closes\":\"17:30\"},{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"00:00\"}],\"email\":\"info@arvenggroup.com\",\"vatID\":\"B87794293\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#\\\/schema\\\/person\\\/84221a22d2933a1a709cf666696d0955\",\"name\":\"arvengtraining\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/577478bdea339eab860e212625deaf0f30f723c02c4005b954b9041708f73ada?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/577478bdea339eab860e212625deaf0f30f723c02c4005b954b9041708f73ada?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/577478bdea339eab860e212625deaf0f30f723c02c4005b954b9041708f73ada?s=96&d=mm&r=g\",\"caption\":\"arvengtraining\"},\"description\":\"ARVENG es una empresa dedicada a la formaci\u00f3n y la ingenier\u00eda, din\u00e1mica y enteramente orientada a encontrar soluciones eficientes y rentables para nuestros clientes. Proporcionamos respuestas y soluciones a requerimientos concretos, esforz\u00e1ndonos en conseguir relaciones duraderas y beneficiosas para todos.\",\"sameAs\":[\"http:\\\/\\\/www.arvengtraining.com\",\"https:\\\/\\\/www.facebook.com\\\/Arveng-Consulting-1397115983869206\\\/\",\"https:\\\/\\\/x.com\\\/ArvengTrainEng\"]},{\"@type\":\"PostalAddress\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#local-main-place-address\",\"streetAddress\":\"Av. de Manoteras, 10, edificio b oficina 111, Hortaleza\",\"addressLocality\":\"Madrid\",\"postalCode\":\"28050\",\"addressRegion\":\"Madrid\",\"addressCountry\":\"ES\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/structuring-engineering-presentation-budget-approval\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg\",\"contentUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg\",\"width\":750,\"height\":384,\"caption\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Madrid\" \/>\n<meta name=\"geo.position\" content=\"40.488398;-3.67123715\" \/>\n<meta name=\"geo.region\" content=\"Spain\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to present engineering projects","description":"Discover how to structure an effective technical presentation for management to achieve budget approvals and changes of engineering criteria.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/","og_locale":"en_US","og_type":"article","og_title":"How to present engineering projects","og_description":"Discover how to structure an effective technical presentation for management to achieve budget approvals and changes of engineering criteria.","og_url":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/","og_site_name":"Arveng Training &amp; Engineering","article_publisher":"https:\/\/www.facebook.com\/ArvengTraining","article_author":"https:\/\/www.facebook.com\/Arveng-Consulting-1397115983869206\/","article_published_time":"2026-06-10T08:00:06+00:00","article_modified_time":"2026-06-10T08:09:22+00:00","og_image":[{"width":1200,"height":513,"url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2026\/06\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg","type":"image\/jpeg"}],"author":"arvengtraining","twitter_card":"summary_large_image","twitter_creator":"@ArvengTrainEng","twitter_site":"@ArvengTraining","twitter_misc":{"Written by":"arvengtraining","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#article","isPartOf":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/"},"author":{"name":"arvengtraining","@id":"https:\/\/arvengtraining.com\/#\/schema\/person\/84221a22d2933a1a709cf666696d0955"},"headline":"How to Structure an Engineering Presentation for Budget Approval","datePublished":"2026-06-10T08:00:06+00:00","dateModified":"2026-06-10T08:09:22+00:00","mainEntityOfPage":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/"},"wordCount":540,"publisher":{"@id":"https:\/\/arvengtraining.com\/#organization"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#primaryimage"},"thumbnailUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2026\/06\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg","keywords":["mechanical engineering","Engineering Project Management","Technical Leadership","Plant Management","Industrial ROI"],"articleSection":["Professional Development"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/","url":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/","name":"How to present engineering projects","isPartOf":{"@id":"https:\/\/arvengtraining.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#primaryimage"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#primaryimage"},"thumbnailUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2026\/06\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg","datePublished":"2026-06-10T08:00:06+00:00","dateModified":"2026-06-10T08:09:22+00:00","description":"Discover how to structure an effective technical presentation for management to achieve budget approvals and changes of engineering criteria.","breadcrumb":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#primaryimage","url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2026\/06\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg","contentUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2026\/06\/11.1-Como-estructurar-una-presentacion-de-ingenieria-para-aprobacion-de-presupuestos.jpg","width":1200,"height":513},{"@type":"BreadcrumbList","@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/arvengtraining.com\/en\/"},{"@type":"ListItem","position":2,"name":"How to Structure an Engineering Presentation for Budget Approval"}]},{"@type":"WebSite","@id":"https:\/\/arvengtraining.com\/#website","url":"https:\/\/arvengtraining.com\/","name":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda","description":"We provide Specialized Training &amp; Engineering Services, answers and solutions for specific requirements.","publisher":{"@id":"https:\/\/arvengtraining.com\/#organization"},"alternateName":"Arveng Training & Engineering - Formaci\u00f3n en ingenier\u00eda online\/presencial","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arvengtraining.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/arvengtraining.com\/#organization","name":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda","url":"https:\/\/arvengtraining.com\/","logo":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#local-main-organization-logo"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/ArvengTraining","https:\/\/x.com\/ArvengTraining","https:\/\/www.linkedin.com\/in\/arvengtraining\/","http:\/\/wwwyoutube.com\/ArvengTraining","https:\/\/www.instagram.com\/arveng_training","https:\/\/www.linkedin.com\/company\/arvengtraining\/"],"address":{"@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"40.488398","longitude":"-3.67123715"},"telephone":["913 40 88 51"],"contactPoint":{"@type":"ContactPoint","telephone":"913408851","email":"info@arvenggroup.com"},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"17:30"},{"@type":"OpeningHoursSpecification","dayOfWeek":["Saturday","Sunday"],"opens":"00:00","closes":"00:00"}],"email":"info@arvenggroup.com","vatID":"B87794293"},{"@type":"Person","@id":"https:\/\/arvengtraining.com\/#\/schema\/person\/84221a22d2933a1a709cf666696d0955","name":"arvengtraining","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/577478bdea339eab860e212625deaf0f30f723c02c4005b954b9041708f73ada?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/577478bdea339eab860e212625deaf0f30f723c02c4005b954b9041708f73ada?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/577478bdea339eab860e212625deaf0f30f723c02c4005b954b9041708f73ada?s=96&d=mm&r=g","caption":"arvengtraining"},"description":"ARVENG es una empresa dedicada a la formaci\u00f3n y la ingenier\u00eda, din\u00e1mica y enteramente orientada a encontrar soluciones eficientes y rentables para nuestros clientes. Proporcionamos respuestas y soluciones a requerimientos concretos, esforz\u00e1ndonos en conseguir relaciones duraderas y beneficiosas para todos.","sameAs":["http:\/\/www.arvengtraining.com","https:\/\/www.facebook.com\/Arveng-Consulting-1397115983869206\/","https:\/\/x.com\/ArvengTrainEng"]},{"@type":"PostalAddress","@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#local-main-place-address","streetAddress":"Av. de Manoteras, 10, edificio b oficina 111, Hortaleza","addressLocality":"Madrid","postalCode":"28050","addressRegion":"Madrid","addressCountry":"ES"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arvengtraining.com\/en\/structuring-engineering-presentation-budget-approval\/#local-main-organization-logo","url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2020\/04\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg","contentUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2020\/04\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg","width":750,"height":384,"caption":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda"}]},"geo.placename":"Madrid","geo.position":{"lat":"40.488398","long":"-3.67123715"},"geo.region":"Spain"},"_links":{"self":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/55625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/comments?post=55625"}],"version-history":[{"count":2,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/55625\/revisions"}],"predecessor-version":[{"id":55674,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/55625\/revisions\/55674"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/media\/55673"}],"wp:attachment":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/media?parent=55625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/categories?post=55625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/tags?post=55625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}