{"id":19833,"date":"2022-10-31T09:25:57","date_gmt":"2022-10-31T08:25:57","guid":{"rendered":"https:\/\/arvengtraining.com\/?p=19833"},"modified":"2022-11-02T14:18:28","modified_gmt":"2022-11-02T13:18:28","slug":"period-of-vibration-pov","status":"publish","type":"post","link":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/","title":{"rendered":"Period of Vibration (POV)"},"content":{"rendered":"<p><strong>A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed. The extent of deflection is proportional to the applied force. The vessel, or its support, will act as a spring. <\/strong>As the force dissipates, the vessel will vibrate through its various modes.<\/p>\n<p><strong>The period of vibration (POV) is the time it takes the vessel to deflect through one mode and return to its original position and is measured in seconds. The frequency, which is the inverse of POV, is the number of cycles per second.<\/strong> The POV of a pressure vessel is a function of the vessel weight, diameter, height, weight distribution, temperature, flexibility, type of support, damping mechanisms and location (if supported in a structure). Typically, when discussing the period of vibration for a vessel the \u201cfirst\u201d period of vibration, or the first \u201cnatural\u201d or \u201cfundamental\u201d period of vibration is implied.<\/p>\n<p>&nbsp;<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19831 aligncenter\" src=\"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/10\/10.1.png\" alt=\"\" width=\"299\" height=\"253\" srcset=\"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/10\/10.1.png 299w, https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/10\/10.1-150x127.png 150w\" sizes=\"auto, (max-width: 299px) 100vw, 299px\" \/><\/em><\/p>\n<p style=\"text-align: center;\"><em>Example of the vibration modes of a cantilever beam, which can be applied to slender pressure vessels.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>Generally, vessels with a POV less than 0.3 seconds (f&gt;3.33 Hz) are considered rigid. Vessels with a POV between 0.3 and 0.75 seconds (1.33 Hz &lt; f &lt; 3.33 Hz) are semi-rigid. Between 0.75 and 1.25 seconds (0.8 Hz &lt; f &lt; 1.33 Hz) vessels are semi-flexible and for a POV greater than 1.25 seconds (0.80 Hz) vessels are considered to be flexible.<\/p>\n<p><strong>A vessel will have a different POV when empty or when full. It will have a different POV for the new and corroded conditions. It will have a different POV for hot and cold conditions due to the varying modulus of elasticity of the steel at each temperature. <\/strong><\/p>\n<p>Vertical vessels on legs and skirts are the most flexible. Vessels on lugs and rings are normally supported in structures and therefore would be subject to the harmonics of the structure itself. Horizontal vessels vibrate with their supports and as well are also impacted by deflections in their piers\/foundations.<\/p>\n<p>The POV depends on the vessel\u2019s weight, diameter, height, weight distribution, temperature, flexibility, type of support, etc. To calculate the POV the mass distribution and exact size\/shape of each component must be known, which is not feasible at early design stages. A good practice and recommended short cut to determine the POV can be found in &#8220;Pressure Vessel Design Manual&#8221; by Dennis Moss, described below.<\/p>\n<p>&nbsp;<\/p>\n<p>If you want to know more:<\/p>\n<p><a href=\"https:\/\/arvengtraining.com\/en\/all-courses\/asme-viii-design-pressure-vessels-online\/\">ASME VIII | Design of pressure vessels for Ind. Plants<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed. The extent of deflection is proportional to the applied force. The vessel, or [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":19860,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[325,327],"tags":[732,1056,1164,1165,1166],"class_list":["post-19833","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-static-equipment-en","category-pressure-vessels-en","tag-pressure-vessels-en","tag-vibration","tag-poc","tag-natural-vibration","tag-fundamental-vibration"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Period of Vibration (POV) - Arveng Training &amp; Engineering<\/title>\n<meta name=\"description\" content=\"A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Period of Vibration (POV) - Arveng Training &amp; Engineering\" \/>\n<meta property=\"og:description\" content=\"A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/\" \/>\n<meta property=\"og:site_name\" content=\"Arveng Training &amp; Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ArvengTraining\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-31T08:25:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-11-02T13:18:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/11\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"jtirenti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ArvengTraining\" \/>\n<meta name=\"twitter:site\" content=\"@ArvengTraining\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"jtirenti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/\"},\"author\":{\"name\":\"jtirenti\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#\\\/schema\\\/person\\\/4d21d5d0a337d55b195e0d1a73776f3d\"},\"headline\":\"Period of Vibration (POV)\",\"datePublished\":\"2022-10-31T08:25:57+00:00\",\"dateModified\":\"2022-11-02T13:18:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/\"},\"wordCount\":431,\"publisher\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg\",\"keywords\":[\"Pressure Vessels\",\"Vibration\",\"POC\",\"natural vibration\",\"fundamental vibration.\"],\"articleSection\":[\"Static Equipment\",\"Pressure Vessels\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/\",\"name\":\"Period of Vibration (POV) - Arveng Training &amp; Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg\",\"datePublished\":\"2022-10-31T08:25:57+00:00\",\"dateModified\":\"2022-11-02T13:18:28+00:00\",\"description\":\"A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#primaryimage\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg\",\"contentUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg\",\"width\":1024,\"height\":576},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Period of Vibration (POV)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#website\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/\",\"name\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\",\"description\":\"We provide Specialized Training &amp; Engineering Services, answers and solutions for specific requirements.\",\"publisher\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\"},\"alternateName\":\"Arveng Training & Engineering - Formaci\u00f3n en ingenier\u00eda online\\\/presencial\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arvengtraining.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\",\"name\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ArvengTraining\",\"https:\\\/\\\/x.com\\\/ArvengTraining\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/arvengtraining\\\/\",\"http:\\\/\\\/wwwyoutube.com\\\/ArvengTraining\",\"https:\\\/\\\/www.instagram.com\\\/arveng_training\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/arvengtraining\\\/\"],\"address\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"40.488398\",\"longitude\":\"-3.67123715\"},\"telephone\":[\"913 40 88 51\"],\"contactPoint\":{\"@type\":\"ContactPoint\",\"telephone\":\"913408851\",\"email\":\"info@arvenggroup.com\"},\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\"],\"opens\":\"09:00\",\"closes\":\"17:30\"},{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"00:00\"}],\"email\":\"info@arvenggroup.com\",\"vatID\":\"B87794293\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#\\\/schema\\\/person\\\/4d21d5d0a337d55b195e0d1a73776f3d\",\"name\":\"jtirenti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/13950d44583a7c7ed23933b6d3854ffed2993ec8fbc4893e0cefad7c0c9e3931?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/13950d44583a7c7ed23933b6d3854ffed2993ec8fbc4893e0cefad7c0c9e3931?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/13950d44583a7c7ed23933b6d3854ffed2993ec8fbc4893e0cefad7c0c9e3931?s=96&d=mm&r=g\",\"caption\":\"jtirenti\"},\"description\":\"Javier Tirenti. Ingeniero Mec\u00e1nico S\u00e9nior y M\u00e1ster en Administraci\u00f3n de Empresas. M\u00e1s de 25 a\u00f1os de experiencia en el dise\u00f1o, c\u00e1lculo y fabricaci\u00f3n de recipientes sometidos a presi\u00f3n, intercambiadores de calor, tanques de almacenaje, sistemas de tuber\u00edas y estructuras en general. La mayor parte participando en proyectos multidisciplinarios de ingenier\u00eda y construcciones principalmente en el sector Oil &amp; Gas y Generaci\u00f3n de Energ\u00eda desempe\u00f1ando diferentes cargos como Jefe de Departamento, L\u00edder de Disciplina, Especialista en Equipos Mec\u00e1nicos, Especialista en Tuber\u00edas, Proyectista y Delineante Mec\u00e1nico. Las responsabilidades de los cargos mencionados abarcan desde la concepci\u00f3n inicial de equipos, delineaci\u00f3n, dise\u00f1o, c\u00e1lculo, hasta la compra, aprobaci\u00f3n de documentaciones de vendedores, asistencia en el izado y puesta en marcha. Entre los proyectos desarrollados se destacan clientes tales como SHELL, EXXON, REPSOL, CHEVRON, GALP, CEPSA, TUPRAS.\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#local-main-place-address\",\"streetAddress\":\"Av. de Manoteras, 10, edificio b oficina 111, Hortaleza\",\"addressLocality\":\"Madrid\",\"postalCode\":\"28050\",\"addressRegion\":\"Madrid\",\"addressCountry\":\"ES\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/period-of-vibration-pov\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg\",\"contentUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg\",\"width\":750,\"height\":384,\"caption\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Madrid\" \/>\n<meta name=\"geo.position\" content=\"40.488398;-3.67123715\" \/>\n<meta name=\"geo.region\" content=\"Spain\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Period of Vibration (POV) - Arveng Training &amp; Engineering","description":"A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/","og_locale":"en_US","og_type":"article","og_title":"Period of Vibration (POV) - Arveng Training &amp; Engineering","og_description":"A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed.","og_url":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/","og_site_name":"Arveng Training &amp; Engineering","article_publisher":"https:\/\/www.facebook.com\/ArvengTraining","article_published_time":"2022-10-31T08:25:57+00:00","article_modified_time":"2022-11-02T13:18:28+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/11\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg","type":"image\/jpeg"}],"author":"jtirenti","twitter_card":"summary_large_image","twitter_creator":"@ArvengTraining","twitter_site":"@ArvengTraining","twitter_misc":{"Written by":"jtirenti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#article","isPartOf":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/"},"author":{"name":"jtirenti","@id":"https:\/\/arvengtraining.com\/#\/schema\/person\/4d21d5d0a337d55b195e0d1a73776f3d"},"headline":"Period of Vibration (POV)","datePublished":"2022-10-31T08:25:57+00:00","dateModified":"2022-11-02T13:18:28+00:00","mainEntityOfPage":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/"},"wordCount":431,"publisher":{"@id":"https:\/\/arvengtraining.com\/#organization"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#primaryimage"},"thumbnailUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/11\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg","keywords":["Pressure Vessels","Vibration","POC","natural vibration","fundamental vibration."],"articleSection":["Static Equipment","Pressure Vessels"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/","url":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/","name":"Period of Vibration (POV) - Arveng Training &amp; Engineering","isPartOf":{"@id":"https:\/\/arvengtraining.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#primaryimage"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#primaryimage"},"thumbnailUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/11\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg","datePublished":"2022-10-31T08:25:57+00:00","dateModified":"2022-11-02T13:18:28+00:00","description":"A pressure vessel subject to an external force or ground motion, due to forces such as the wind or an earthquake, will deflect to a specific shape and then return to its original position once the applied force is dissipated or removed.","breadcrumb":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#primaryimage","url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/11\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg","contentUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/11\/API-510.-Inspeccion-y-reparacion-de-equipos.jpg","width":1024,"height":576},{"@type":"BreadcrumbList","@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/arvengtraining.com\/en\/"},{"@type":"ListItem","position":2,"name":"Period of Vibration (POV)"}]},{"@type":"WebSite","@id":"https:\/\/arvengtraining.com\/#website","url":"https:\/\/arvengtraining.com\/","name":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda","description":"We provide Specialized Training &amp; Engineering Services, answers and solutions for specific requirements.","publisher":{"@id":"https:\/\/arvengtraining.com\/#organization"},"alternateName":"Arveng Training & Engineering - Formaci\u00f3n en ingenier\u00eda online\/presencial","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arvengtraining.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/arvengtraining.com\/#organization","name":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda","url":"https:\/\/arvengtraining.com\/","logo":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#local-main-organization-logo"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/ArvengTraining","https:\/\/x.com\/ArvengTraining","https:\/\/www.linkedin.com\/in\/arvengtraining\/","http:\/\/wwwyoutube.com\/ArvengTraining","https:\/\/www.instagram.com\/arveng_training","https:\/\/www.linkedin.com\/company\/arvengtraining\/"],"address":{"@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"40.488398","longitude":"-3.67123715"},"telephone":["913 40 88 51"],"contactPoint":{"@type":"ContactPoint","telephone":"913408851","email":"info@arvenggroup.com"},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"17:30"},{"@type":"OpeningHoursSpecification","dayOfWeek":["Saturday","Sunday"],"opens":"00:00","closes":"00:00"}],"email":"info@arvenggroup.com","vatID":"B87794293"},{"@type":"Person","@id":"https:\/\/arvengtraining.com\/#\/schema\/person\/4d21d5d0a337d55b195e0d1a73776f3d","name":"jtirenti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13950d44583a7c7ed23933b6d3854ffed2993ec8fbc4893e0cefad7c0c9e3931?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13950d44583a7c7ed23933b6d3854ffed2993ec8fbc4893e0cefad7c0c9e3931?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13950d44583a7c7ed23933b6d3854ffed2993ec8fbc4893e0cefad7c0c9e3931?s=96&d=mm&r=g","caption":"jtirenti"},"description":"Javier Tirenti. Ingeniero Mec\u00e1nico S\u00e9nior y M\u00e1ster en Administraci\u00f3n de Empresas. M\u00e1s de 25 a\u00f1os de experiencia en el dise\u00f1o, c\u00e1lculo y fabricaci\u00f3n de recipientes sometidos a presi\u00f3n, intercambiadores de calor, tanques de almacenaje, sistemas de tuber\u00edas y estructuras en general. La mayor parte participando en proyectos multidisciplinarios de ingenier\u00eda y construcciones principalmente en el sector Oil &amp; Gas y Generaci\u00f3n de Energ\u00eda desempe\u00f1ando diferentes cargos como Jefe de Departamento, L\u00edder de Disciplina, Especialista en Equipos Mec\u00e1nicos, Especialista en Tuber\u00edas, Proyectista y Delineante Mec\u00e1nico. Las responsabilidades de los cargos mencionados abarcan desde la concepci\u00f3n inicial de equipos, delineaci\u00f3n, dise\u00f1o, c\u00e1lculo, hasta la compra, aprobaci\u00f3n de documentaciones de vendedores, asistencia en el izado y puesta en marcha. Entre los proyectos desarrollados se destacan clientes tales como SHELL, EXXON, REPSOL, CHEVRON, GALP, CEPSA, TUPRAS."},{"@type":"PostalAddress","@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#local-main-place-address","streetAddress":"Av. de Manoteras, 10, edificio b oficina 111, Hortaleza","addressLocality":"Madrid","postalCode":"28050","addressRegion":"Madrid","addressCountry":"ES"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arvengtraining.com\/en\/period-of-vibration-pov\/#local-main-organization-logo","url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2020\/04\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg","contentUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2020\/04\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg","width":750,"height":384,"caption":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda"}]},"geo.placename":"Madrid","geo.position":{"lat":"40.488398","long":"-3.67123715"},"geo.region":"Spain"},"_links":{"self":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/19833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/comments?post=19833"}],"version-history":[{"count":2,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/19833\/revisions"}],"predecessor-version":[{"id":19862,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/19833\/revisions\/19862"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/media\/19860"}],"wp:attachment":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/media?parent=19833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/categories?post=19833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/tags?post=19833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}