{"id":18685,"date":"2022-06-01T15:40:04","date_gmt":"2022-06-01T13:40:04","guid":{"rendered":"https:\/\/arvengtraining.com\/?p=18685"},"modified":"2022-06-01T16:34:17","modified_gmt":"2022-06-01T14:34:17","slug":"total-installed-cost-considerations-for-steel-fabrication-on-large-projects","status":"publish","type":"post","link":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/","title":{"rendered":"Total Installed Cost Considerations for Steel Fabrication on Large Projects"},"content":{"rendered":"<p>In many engineering companies, each individual discipline is usually challenged to work within the lowest possible budget \u2013 both for workhours and for material costs.<\/p>\n<p>The lowest possible cost at the discipline or material level is not always the least expensive overall (both in terms of cost, but also in time in the fabrication shop and assembly in the field).<\/p>\n<p>Smaller steel sections may have the lowest initial cost, but when the cost of added braces, stiffeners, gussets, etc. are included, they are not always the least expensive in terms of time in the fabrication shop and ease\/number of workhours required for installation in the field.\u00a0 Keep in mind that direct construction hours are supported by indirect costs, so any reduction in the number of work hours can pay a double dividend in the field.<\/p>\n<p>For a job with several large piperacks and\/or equipment platforms it is worthwhile doing an exercise early in engineering to see if there are piperacks or other structures that can be constructed of the same size sections, even if some would be larger than the most efficient design would suggest.<\/p>\n<p>Sections with less bracing are simpler and faster to produce.\u00a0 Fewer cutting and welding operations will mean faster production.<\/p>\n<p>It is a good idea to work with the steel fabricator so that they understand the correct number and timing of detailers, as this will vary from the norm.\u00a0 A bulk order of steel section(s) is another possibility to explore.\u00a0 If the fabricator is responsible for shipping to the next location, this will help them plan the most cost efficient\/effective transportation.\u00a0 Also, cleaner sections should (somewhat) reduce the number of review cycles.<\/p>\n<p>Shop drawing reviews must also be assessed.\u00a0 If structures can be made with the same sections, there could be fewer erection drawings to review overall.\u00a0 Insufficient manpower to review these drawings can hold up a number of tonnes to advance to the shop floor.\u00a0 However, as always, it is a delicate balance between having enough manpower available to review the drawings at the earliest time, completing other civil\/structural engineering tasks, and not overstaffing the job.<\/p>\n<p>A significant portion of the time allotted for drawing review is used by document control to receive\/distribute\/return erection and piece drawings.\u00a0 It is worthwhile to spend time with them so they are aware of the number of documents that they will be required to process and the likely timeframe.<\/p>\n<p>In the field or assembly yard, fabricated sections with fewer protrusions have less chance of being accidently damaged when being unloaded and marshalled.\u00a0 They are quicker to erect and they look cleaner.<\/p>\n<p>The costs of the additional engineering hours to assess the situation and the initially higher costs of slightly larger steel sections should be compared against lower shop fabrication costs and lower assembly costs in the yard or at the job site.\u00a0 The potential for significant savings in total installed cost and assembly time is a prize worth pursuing.<\/p>\n<p>&nbsp;<\/p>\n<p>If you want to know more:<\/p>\n<p><a href=\"https:\/\/arvengtraining.com\/en\/?post_type=product&#038;p=4591\">Introduction to industrial projects<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In many engineering companies, each individual discipline is usually challenged to work within the lowest possible budget \u2013 both for workhours and for material costs. The lowest possible cost at the discipline or material level is not always the least expensive overall (both in terms of cost, but also in time in the fabrication shop [&hellip;]<\/p>\n","protected":false},"author":483,"featured_media":18693,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[324],"tags":[318,912,992,1075],"class_list":["post-18685","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects-en","tag-engineering","tag-cost","tag-projects","tag-manufacturing"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Total Installed Cost Considerations for Steel Fabrication on Large Projects - Arveng Training &amp; Engineering<\/title>\n<meta name=\"description\" content=\"Total Installed Cost Considerations for Steel Fabrication on Large Projects\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Total Installed Cost Considerations for Steel Fabrication on Large Projects - Arveng Training &amp; Engineering\" \/>\n<meta property=\"og:description\" content=\"Total Installed Cost Considerations for Steel Fabrication on Large Projects\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Arveng Training &amp; Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ArvengTraining\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-01T13:40:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-01T14:34:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/distillery-g464d2f518_1920.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1542\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bonnie Baker\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/distillery-g464d2f518_1920.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@ArvengTraining\" \/>\n<meta name=\"twitter:site\" content=\"@ArvengTraining\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bonnie Baker\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/\"},\"author\":{\"name\":\"Bonnie Baker\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#\\\/schema\\\/person\\\/6553edf8437483d1b0895bf6a9c5fc9e\"},\"headline\":\"Total Installed Cost Considerations for Steel Fabrication on Large Projects\",\"datePublished\":\"2022-06-01T13:40:04+00:00\",\"dateModified\":\"2022-06-01T14:34:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/\"},\"wordCount\":517,\"publisher\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/06.-Steel-Fabrication-5-1.jpg\",\"keywords\":[\"Engineering\",\"cost\",\"projects\",\"manufacturing\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/\",\"name\":\"Total Installed Cost Considerations for Steel Fabrication on Large Projects - Arveng Training &amp; Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/06.-Steel-Fabrication-5-1.jpg\",\"datePublished\":\"2022-06-01T13:40:04+00:00\",\"dateModified\":\"2022-06-01T14:34:17+00:00\",\"description\":\"Total Installed Cost Considerations for Steel Fabrication on Large Projects\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#primaryimage\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/06.-Steel-Fabrication-5-1.jpg\",\"contentUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/06.-Steel-Fabrication-5-1.jpg\",\"width\":1920,\"height\":1542},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Total Installed Cost Considerations for Steel Fabrication on Large Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#website\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/\",\"name\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\",\"description\":\"We provide Specialized Training &amp; Engineering Services, answers and solutions for specific requirements.\",\"publisher\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\"},\"alternateName\":\"Arveng Training & Engineering - Formaci\u00f3n en ingenier\u00eda online\\\/presencial\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arvengtraining.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#organization\",\"name\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ArvengTraining\",\"https:\\\/\\\/x.com\\\/ArvengTraining\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/arvengtraining\\\/\",\"http:\\\/\\\/wwwyoutube.com\\\/ArvengTraining\",\"https:\\\/\\\/www.instagram.com\\\/arveng_training\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/arvengtraining\\\/\"],\"address\":{\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"40.488398\",\"longitude\":\"-3.67123715\"},\"telephone\":[\"913 40 88 51\"],\"contactPoint\":{\"@type\":\"ContactPoint\",\"telephone\":\"913408851\",\"email\":\"info@arvenggroup.com\"},\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\"],\"opens\":\"09:00\",\"closes\":\"17:30\"},{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"00:00\"}],\"email\":\"info@arvenggroup.com\",\"vatID\":\"B87794293\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/#\\\/schema\\\/person\\\/6553edf8437483d1b0895bf6a9c5fc9e\",\"name\":\"Bonnie Baker\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa1c4e784f8bf77413f52c5ec3dc6cfb280eda6f60c0960157744b7ed1a20ed2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa1c4e784f8bf77413f52c5ec3dc6cfb280eda6f60c0960157744b7ed1a20ed2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa1c4e784f8bf77413f52c5ec3dc6cfb280eda6f60c0960157744b7ed1a20ed2?s=96&d=mm&r=g\",\"caption\":\"Bonnie Baker\"}},{\"@type\":\"PostalAddress\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#local-main-place-address\",\"streetAddress\":\"Av. de Manoteras, 10, edificio b oficina 111, Hortaleza\",\"addressLocality\":\"Madrid\",\"postalCode\":\"28050\",\"addressRegion\":\"Madrid\",\"addressCountry\":\"ES\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arvengtraining.com\\\/en\\\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg\",\"contentUrl\":\"https:\\\/\\\/arvengtraining.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg\",\"width\":750,\"height\":384,\"caption\":\"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Madrid\" \/>\n<meta name=\"geo.position\" content=\"40.488398;-3.67123715\" \/>\n<meta name=\"geo.region\" content=\"Spain\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Total Installed Cost Considerations for Steel Fabrication on Large Projects - Arveng Training &amp; Engineering","description":"Total Installed Cost Considerations for Steel Fabrication on Large Projects","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/","og_locale":"en_US","og_type":"article","og_title":"Total Installed Cost Considerations for Steel Fabrication on Large Projects - Arveng Training &amp; Engineering","og_description":"Total Installed Cost Considerations for Steel Fabrication on Large Projects","og_url":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/","og_site_name":"Arveng Training &amp; Engineering","article_publisher":"https:\/\/www.facebook.com\/ArvengTraining","article_published_time":"2022-06-01T13:40:04+00:00","article_modified_time":"2022-06-01T14:34:17+00:00","og_image":[{"width":1920,"height":1542,"url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/distillery-g464d2f518_1920.jpg","type":"image\/jpeg"}],"author":"Bonnie Baker","twitter_card":"summary_large_image","twitter_image":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/distillery-g464d2f518_1920.jpg","twitter_creator":"@ArvengTraining","twitter_site":"@ArvengTraining","twitter_misc":{"Written by":"Bonnie Baker","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#article","isPartOf":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/"},"author":{"name":"Bonnie Baker","@id":"https:\/\/arvengtraining.com\/#\/schema\/person\/6553edf8437483d1b0895bf6a9c5fc9e"},"headline":"Total Installed Cost Considerations for Steel Fabrication on Large Projects","datePublished":"2022-06-01T13:40:04+00:00","dateModified":"2022-06-01T14:34:17+00:00","mainEntityOfPage":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/"},"wordCount":517,"publisher":{"@id":"https:\/\/arvengtraining.com\/#organization"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/06.-Steel-Fabrication-5-1.jpg","keywords":["Engineering","cost","projects","manufacturing"],"articleSection":["Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/","url":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/","name":"Total Installed Cost Considerations for Steel Fabrication on Large Projects - Arveng Training &amp; Engineering","isPartOf":{"@id":"https:\/\/arvengtraining.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#primaryimage"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/06.-Steel-Fabrication-5-1.jpg","datePublished":"2022-06-01T13:40:04+00:00","dateModified":"2022-06-01T14:34:17+00:00","description":"Total Installed Cost Considerations for Steel Fabrication on Large Projects","breadcrumb":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#primaryimage","url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/06.-Steel-Fabrication-5-1.jpg","contentUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2022\/06\/06.-Steel-Fabrication-5-1.jpg","width":1920,"height":1542},{"@type":"BreadcrumbList","@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/arvengtraining.com\/en\/"},{"@type":"ListItem","position":2,"name":"Total Installed Cost Considerations for Steel Fabrication on Large Projects"}]},{"@type":"WebSite","@id":"https:\/\/arvengtraining.com\/#website","url":"https:\/\/arvengtraining.com\/","name":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda","description":"We provide Specialized Training &amp; Engineering Services, answers and solutions for specific requirements.","publisher":{"@id":"https:\/\/arvengtraining.com\/#organization"},"alternateName":"Arveng Training & Engineering - Formaci\u00f3n en ingenier\u00eda online\/presencial","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arvengtraining.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/arvengtraining.com\/#organization","name":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda","url":"https:\/\/arvengtraining.com\/","logo":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#local-main-organization-logo"},"image":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/ArvengTraining","https:\/\/x.com\/ArvengTraining","https:\/\/www.linkedin.com\/in\/arvengtraining\/","http:\/\/wwwyoutube.com\/ArvengTraining","https:\/\/www.instagram.com\/arveng_training","https:\/\/www.linkedin.com\/company\/arvengtraining\/"],"address":{"@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"40.488398","longitude":"-3.67123715"},"telephone":["913 40 88 51"],"contactPoint":{"@type":"ContactPoint","telephone":"913408851","email":"info@arvenggroup.com"},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"17:30"},{"@type":"OpeningHoursSpecification","dayOfWeek":["Saturday","Sunday"],"opens":"00:00","closes":"00:00"}],"email":"info@arvenggroup.com","vatID":"B87794293"},{"@type":"Person","@id":"https:\/\/arvengtraining.com\/#\/schema\/person\/6553edf8437483d1b0895bf6a9c5fc9e","name":"Bonnie Baker","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fa1c4e784f8bf77413f52c5ec3dc6cfb280eda6f60c0960157744b7ed1a20ed2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fa1c4e784f8bf77413f52c5ec3dc6cfb280eda6f60c0960157744b7ed1a20ed2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fa1c4e784f8bf77413f52c5ec3dc6cfb280eda6f60c0960157744b7ed1a20ed2?s=96&d=mm&r=g","caption":"Bonnie Baker"}},{"@type":"PostalAddress","@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#local-main-place-address","streetAddress":"Av. de Manoteras, 10, edificio b oficina 111, Hortaleza","addressLocality":"Madrid","postalCode":"28050","addressRegion":"Madrid","addressCountry":"ES"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arvengtraining.com\/en\/total-installed-cost-considerations-for-steel-fabrication-on-large-projects\/#local-main-organization-logo","url":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2020\/04\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg","contentUrl":"https:\/\/arvengtraining.com\/wp-content\/uploads\/2020\/04\/ARVENG-RGB-LOGO-VECTORIAL-2-840x430-1-e1588673301938.jpg","width":750,"height":384,"caption":"Arveng Training Engineering | Cursos y Master en Ingenier\u00eda"}]},"geo.placename":"Madrid","geo.position":{"lat":"40.488398","long":"-3.67123715"},"geo.region":"Spain"},"_links":{"self":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/18685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/users\/483"}],"replies":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/comments?post=18685"}],"version-history":[{"count":2,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/18685\/revisions"}],"predecessor-version":[{"id":18696,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/posts\/18685\/revisions\/18696"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/media\/18693"}],"wp:attachment":[{"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/media?parent=18685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/categories?post=18685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arvengtraining.com\/en\/wp-json\/wp\/v2\/tags?post=18685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}